"Engineering services and executive and on-site supervision for the construction of the 230 kV Titanium Kohnooj Substation"
Voltage Level / Capacity: 230 kV
Owner / Operator: Pasargad Steel Company / Kerman Regional Electricity Company
Consultant Services: Design, executive, and on-site supervision
Progress: 100%
Start Date: 22 October 2022 (1401/08/01)
Completion Date: 22 November 2024 (1403/09/01)
Project Status: Energized – Temporary Handover
"Engineering services and executive and on-site supervision for the construction of the 230 kV double-circuit Titanium Kohnooj Transmission Line"
Voltage Level / Capacity: 230 kV
Owner / Operator: Pasargad Steel Company / Kerman Regional Electricity Company
Consultant Services: Design, executive, and on-site supervision
Progress: 100%
Start Date: 22 October 2022 (1401/08/01)
Completion Date: 22 November 2024 (1403/09/01)
Project Status: Energized – Temporary Handover
"Grid connection studies and electrification of Pouyan Gohar Kerman Factory"
Voltage Level / Capacity: 400 kV
Owner / Operator: Pouyan Gohar Kerman Company / Kerman Regional Electricity Company
Consultant Services: Studies
Progress: 100%
Start Date: 21 February 2024 (1402/12/01)
Completion Date: 21 November 2024 (1403/08/30)
Project Status: Studies and final connection design completed
"Grid connection studies and electrification of Hadid Pouya Tousan Semangan Factory"
Voltage Level / Capacity: 400 kV
Owner / Operator: Hadid Pouya Tousan Semangan Company / Kerman Regional Electricity Company
Consultant Services: Studies
Progress: 100%
Start Date: 28 February 2024 (1402/12/08)
Completion Date: 21 November 2024 (1403/08/30)
Project Status: Studies and final connection design completed
"Detailed design services for the 43 km, 230 kV double-circuit Raavar Steel Transmission Line"
Voltage Level / Capacity: 230 kV
Owner / Operator: Kavand Nahan Zamin / Kerman Regional Electricity Company
Consultant Services: Engineering Services
Progress: 97%
Start Date: 22 December 2023 (1402/10/01)
Completion Date: Ongoing
Project Status: Ready for Temporary Handover
"Detailed design services for the 230/132 kV Zarand 2 Substation expansion"
Voltage Level / Capacity: 230/132 kV
Owner / Operator: Kavand Nahan Zamin / Kerman Regional Electricity Company
Consultant Services: Engineering Services
Progress: 97%
Start Date: 22 December 2023 (1402/10/01)
Completion Date: Ongoing
Project Status: Ready for Temporary Handover
"Detailed design services for the 132/20 kV dedicated substation of Raavar Steel Factory and the in-plant distribution network"
Voltage Level / Capacity: 132/20 kV
Owner / Operator: Kavand Nahan Zamin
Consultant Services: Engineering Services
Progress: 95%
Start Date: 22 December 2023 (1402/10/01)
Completion Date: Ongoing
Project Status: In Progress
"Design services for the 400 kV switchyard of Tolou-e Tejarat Khalij-e Fars Expansion"
Voltage Level / Capacity: 400/230/132/33 kV
Owner / Operator: Tolou-e Khalij-e Fars Development Holding / Kerman Regional Electricity Company
Consultant Services: Engineering Services and Executive Supervision
Progress: 65%
Start Date: 6 November 2023 (1402/08/15)
Completion Date: Ongoing
Project Status: In Progress
"Design services for the 400 kV double-circuit Tolou Expansion Transmission Line"
Voltage Level / Capacity: 400 kV
Owner / Operator: Tolou-e Khalij-e Fars Development Holding / Kerman Regional Electricity Company
Consultant Services: Engineering Services and Executive Supervision
Progress: 65%
Start Date: 6 November 2023 (1402/08/15)
Completion Date: Ongoing
Project Status: In Progress
"Electrical engineering services for the electrification of Shams Tabriz, Saeb Tabriz, Fero Alloy Shahriar Parsa, and Gostaresh Foolad Tabriz factories with a total capacity of 220 MW"
Voltage Level / Capacity: 230/132 kV
Owner / Operator: Shams Tabriz Steel Company / Azerbaijan Regional Electricity Company
Consultant Services: Engineering Services and Executive Supervision
Progress: 90%
Start Date: 26 April 2024 (1403/02/06)
Completion Date: Ongoing
Project Status: In Progress
"Renovation and optimization of the protection and control automation system of the 400 kV Shahid Soleimani Power Plant Substation (Baghin), Kerman"
Voltage Level / Capacity: 400/230 kV
Owner / Operator: Kerman Regional Electricity Company
Consultant Services: Consulting and Detailed Design Services
Progress: 55%
Start Date: 22 November 2024 (1403/09/01)
Completion Date: Ongoing
Project Status: In Progress
"Construction of the 230/20 kV Miduk Power Plant Substation"
Voltage Level / Capacity: 230/20 kV
Owner / Operator: Niro Sanat Sarcheshmeh / National Iranian Copper Company
Consultant Services: Detailed Design Services
Progress: 10%
Start Date: 9 July 2025 (1404/04/18)
Completion Date: Ongoing
Project Status: In Progress
"230/132 kV transformer expansion at the 230 kV Persia Substation (Butia Steel) and construction of a 132 kV line for grid connection"
Voltage Level / Capacity: 230/132 kV
Owner / Operator: Kerman Regional Electricity Company
Consultant Services: Consulting and Detailed Design Services
Progress: 70%
Start Date: 20 January 2025 (1403/11/01)
Completion Date: Ongoing
Project Status: In Progress
"Replacement of aged 400, 230, and 132 kV breakers in the transmission and sub-transmission network of Kerman province, covering 14 substations"
Voltage Level / Capacity: 400/230/132 kV
Owner / Operator: Kerman Regional Electricity Company
Consultant Services: Consulting and Detailed Design Services
Progress: 25%
Start Date: 15 April 2025 (1404/01/26)
Completion Date: Ongoing
Project Status: In Progress
"Comprehensive grid connection plan to supply 90 MW demand of the concentrator units in the Sardooyeh Copper Project, Jiroft"
Voltage Level / Capacity: 400/230 kV
Owner / Operator: Soren Mahan Sirjan Mineral Development Company (affiliated with Tourism Bank)
Consultant Services: Studies
Progress: 70%
Start Date: 21 April 2025 (1404/02/01)
Completion Date: Ongoing
Project Status: Studies Completed
"Replacement of 20 kV switchgear at the 63/20 kV Islamabad and Zahklout Substations"
Voltage Level / Capacity: 63/20 kV
Owner / Operator: Kerman Regional Electricity Company
Consultant Services: Engineering Services
Progress: 10%
Start Date: 6 July 2025 (1404/04/15)
Completion Date: Ongoing
Project Status: In Progress
"230 kV Pariz (Dareh Zar) Switchyard Expansion"
Voltage Level / Capacity: 230 kV
Owner / Operator: Niro Sanat Sarcheshmeh / National Iranian Copper Company
Consultant Services: Detailed Design Services
Progress: 35%
Start Date: 9 July 2025 (1404/04/18)
Completion Date: Ongoing
Project Status: In Progress
Solar Power Projects
"Grid connection for 5,000 MW of solar power plants across the provinces of Kerman, Yazd, and Fars"
Voltage Level / Capacity: 400 kV & 230 kV
Owner / Operator: Energy Gostar Hooran Paya Company
Consultant Services: Engineering Services
Progress: 35%
Start Date: 20 January 2025 (1403/11/01)
Completion Date: Ongoing
Project Status: In Progress